Contracting authority : Aubergenville city council
Chief engineer assistant : BET Bonnel et Gardel
Mission : eco-building, HQE architecture
Contractors : France ASSAINISEMENT - GC PINTO
Treatment abilities : 20 000 EH
Works outlay : about 6 000k€ (exclusive of tax)
Localisation : Aubergenville (78)
Market concluded in November 2007
The wastewater treatment plant was introduced into the landscape and designed in order to establish a link which would enable a direct connexion between the surrounding farming weft and the industrial sites close to the plant.
Eco-building targets :
Target 1 : harmonious relationship between the building and its surroundings. Use of natural materials, solid wood.
Target 3 : Low pollution building site.
Eco-management targets :
Target 4 : Energy control. Bioclimatic building made out of solid wood, ground-coupled heat exchangers, thermal solar sensors.
Target 5 : Water control. Buffering rainwaters green roof, rainwater storage and reuse for the toilets. Run-off rainwater collection on waterproof areas and gravity transport system to a damp green area.
Target 6 : Activity dust control.
Target 7 : Care and maintenance.
Comfort targets :
Target 8 : Hygrothermal comfort. Isolating green roof.
Target 11 : Olfactory comfort. Control of the fouled air coming out of the wastewater treatment plant by vegetables (green filter).
Target 10 : Visual comfort. Landscaping of the surroundings by management of the biodiversity thanks to a selection of vegetables introduced in the site.
