ECO-DESIGN OF THE SEWAGE TREATMENT PLANT
IN AUBEVOYE (27)

Client : Association of local authorities Eure-Madrie-Seine
Location : Aubevoye (27)
Project : Architecture HEQ® consultant and landscaping of waste water treatment plant of Aubevoye
Mission : HQE® and landscaping
Design built : GROUPE 3 ARCHITECTES - AR ARCHITECTES -SOGETI
Area : 4000 m²
Cost : 4 500K€ HT
Date : Construction in progress

The waste water-treatment plant architecture of Aubevoye aims to create a dialogue with the surrounding rural areas while respecting the biological balance in place and giving the development complex, using landscaping and architectural treatment, volumes, heights and coverings to harmonize new constructions with the immediate environment.

Treated HQE® targets :

Target 1: Harmonious relation of the buildings with their immediate environment

  • The bio climate complex, partially opened to public, is a definite reference for an educational tour of the plant.

  • Wood cladding: solid and robust material, recyclable material, naturally regulates dampness, quick assembly, strong resistance to earthquakes, thermal and phonic resistant.

 

Target 2: Integrated choices for construction process

  • Homogeneity in treating the front of projected buildings by using biodegradable materials. Laminated wooden frame, robust and sound materials, renewable and recyclable, quick assembly, light weight structure enabling savings in foundations

 

Target 4: energy management

  • The Canadian well provides a supply of fresh air into the building carrying it in an underground air duct. According to the temperature, this air duct cools down or heats the air using the grounds thermal inertia.

 

Target 5: water management

  • Collect and treatment of rain water by green organic roofs.

  • Treatment of streaming water by planted ditches