{"id":7598,"date":"2023-08-11T15:15:31","date_gmt":"2023-08-11T15:15:31","guid":{"rendered":"https:\/\/www.ar-architectes.com\/?post_type=projet&#038;p=7598"},"modified":"2026-05-19T10:09:24","modified_gmt":"2026-05-19T10:09:24","slug":"eco-design-of-the-ecluse-carree-pumping-station-france","status":"publish","type":"projet","link":"https:\/\/www.ar-architectes.com\/en\/project\/eco-design-of-the-ecluse-carree-pumping-station-france\/","title":{"rendered":"Eco-design of the Ecluse Carr\u00e9e pumping station &#8211; france"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"7598\" class=\"elementor elementor-7598\">\n\t\t\t\t<div class=\"elementor-element elementor-element-48fbf823 e-flex e-con-boxed e-con e-parent\" data-id=\"48fbf823\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8a516db elementor-widget elementor-widget-text-editor\" data-id=\"8a516db\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Eco-design of the ECLUSE CARREE pumping station for the optimization of the Rivi\u00e8re Neuve \/ Pierrettes hydraulic system &#8211; france &#8211; along the water<\/h2><p style=\"color: #000000;\">\u00a0<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-57bcde2 e-flex e-con-boxed e-con e-parent\" data-id=\"57bcde2\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-f5cd2dd e-con-full e-flex e-con e-child\" data-id=\"f5cd2dd\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-75fe237 e-con-full e-flex e-con e-child\" data-id=\"75fe237\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-ba3e068 projets-highlight elementor-widget elementor-widget-text-editor\" data-id=\"ba3e068\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Client\u00a0:<\/strong> <span class=\"fontstyle0\">Institution Intercommunale des<br \/>Wateringues<\/span><\/p><p><strong>Location\u00a0:<\/strong> <span class=\"fontstyle0\">Coulogne &#8211; France<\/span><\/p><p><strong>Project\u00a0:<\/strong>\u00a0Construction<span class=\"fontstyle0\">\u00a0of hydraulic structures on the River Neuve \/ Pierrettes<\/span><\/p><p><strong>Consultant : <\/strong> <span class=\"fontstyle0\">SETEC HYDRATEC \/ AR ARCHITECTES<\/span><\/p><p><strong>Cost :<\/strong>\u00a07 000 000 \u20ac HT<\/p><p><strong>Date :\u00a0<\/strong><span class=\"fontstyle0\">Detailled design studies &#8211; 2026<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ab3b551 elementor-widget elementor-widget-text-editor\" data-id=\"ab3b551\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The Ecluse Carr\u00e9e pumping station project forms part of the optimization of the Rivi\u00e8re Neuve \/ Pierrettes hydraulic system, with the objective of <strong>improving stormwater management and reducing flood risks.<\/strong> Located within a <strong>natural wetland area<\/strong>, in the immediate vicinity of a <strong>ZNIEFF<\/strong> ecological protection zone, the project is set within an <strong>open landscape shaped by canals, waterways, and agricultural land<\/strong>, where environmental, landscape, and biodiversity preservation issues are particularly sensitive.<\/p><p>\u00a0<\/p><p>The project develops a <strong>sober and contemporary architectural language<\/strong> based on the notions of <strong>osmosis, simplicity, and linearity<\/strong>, giving rise to the concept <em><strong>Along the Water<\/strong><\/em>. Conceived as a <strong>discreet infrastructure<\/strong> following the <strong>lines of the hydraulic landscape<\/strong>, the building adopts a <strong>simple and controlled architectural expression, in dialogue with the canals, embankments, and the horizontality<\/strong> of the site. The selected materials (wood, aged roof tiles, and vegetated walls), together with the treatment of the external spaces, reinforce this <strong>ambition of environmental and landscape integration<\/strong> through a <strong>sensitive and sustainable approach to the territory.<\/strong><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-523448a e-con-full e-flex e-con e-child\" data-id=\"523448a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-cc989d2 elementor-widget elementor-widget-image\" data-id=\"cc989d2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"644\" src=\"https:\/\/www.ar-architectes.com\/wp-content\/uploads\/2026\/05\/AR_4225_ECLUSECARREE_300426-1024x644.png\" class=\"attachment-large size-large wp-image-7447\" alt=\"\" srcset=\"https:\/\/www.ar-architectes.com\/wp-content\/uploads\/2026\/05\/AR_4225_ECLUSECARREE_300426-1024x644.png 1024w, https:\/\/www.ar-architectes.com\/wp-content\/uploads\/2026\/05\/AR_4225_ECLUSECARREE_300426-300x189.png 300w, https:\/\/www.ar-architectes.com\/wp-content\/uploads\/2026\/05\/AR_4225_ECLUSECARREE_300426-768x483.png 768w, https:\/\/www.ar-architectes.com\/wp-content\/uploads\/2026\/05\/AR_4225_ECLUSECARREE_300426-700x441.png 700w, https:\/\/www.ar-architectes.com\/wp-content\/uploads\/2026\/05\/AR_4225_ECLUSECARREE_300426.png 1481w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-85d08f5 e-flex e-con-boxed e-con e-parent\" data-id=\"85d08f5\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f7f695b download-file-button elementor-widget elementor-widget-bridge_icon_text\" data-id=\"f7f695b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"bridge_icon_text.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class='q_icon_with_title small normal_icon '><div class=\"icon_holder \" style=\" \"><span data-icon-type=\"normal\"   style=\"\" class=\"qode_iwt_icon_holder q_font_awsome_icon fa-2x  \"><i class=\"qode_icon_font_awesome fa fa-download qode_iwt_icon_element\" style=\"color: #66B545;\" ><\/i><\/span><\/div><div class=\"icon_text_holder\" style=\"\"><div class=\"icon_text_inner\" style=\"\"><h5 class=\"icon_title\" style=\"color: #000000;font-weight: 700;\"><\/h5><p style='color: #000000'><\/p><a itemprop='url' class='icon_with_title_link' href='https:\/\/www.ar-architectes.com\/wp-content\/uploads\/2026\/05\/AR_FICHE-PROJET_EN_ECLUSE_CARREE_CALAIS_190526.pdf' target='_self' style='color: #000000;'>T\u00c9L\u00c9CHARGER LA FICHE COMPL\u00c8TE DE CE PROJET<\/a><\/div><\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Construction of the Ecluse Carr\u00e9e pumping station in Calais &#8211; France<\/p>\n","protected":false},"featured_media":7447,"template":"","categories":[27],"tags":[26],"class_list":["post-7598","projet","type-projet","status-publish","has-post-thumbnail","hentry","category-france-en","tag-eco-construction-en"],"_links":{"self":[{"href":"https:\/\/www.ar-architectes.com\/en\/wp-json\/wp\/v2\/projet\/7598","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ar-architectes.com\/en\/wp-json\/wp\/v2\/projet"}],"about":[{"href":"https:\/\/www.ar-architectes.com\/en\/wp-json\/wp\/v2\/types\/projet"}],"version-history":[{"count":9,"href":"https:\/\/www.ar-architectes.com\/en\/wp-json\/wp\/v2\/projet\/7598\/revisions"}],"predecessor-version":[{"id":7613,"href":"https:\/\/www.ar-architectes.com\/en\/wp-json\/wp\/v2\/projet\/7598\/revisions\/7613"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ar-architectes.com\/en\/wp-json\/wp\/v2\/media\/7447"}],"wp:attachment":[{"href":"https:\/\/www.ar-architectes.com\/en\/wp-json\/wp\/v2\/media?parent=7598"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ar-architectes.com\/en\/wp-json\/wp\/v2\/categories?post=7598"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ar-architectes.com\/en\/wp-json\/wp\/v2\/tags?post=7598"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}