THERMAL REHABILITATION, BIOCLIMATIC ECO-EXTENSION FROM L'ATELIER DES ORMES, LOW CARBON PROJECT IN ORMES-SUR-VOULZIE (77)
Client : Eau de Paris
Location : LES ORMES-SUR-VOULZIE (France, 77)
Project : Thermal rehabilitation, bioclimatic eco-extension of the workshop extension
Consultant : AR ARCHITECTES, BOST INGENIERIE, EUROELEC SMART ENERGY
Area : 1 128 m² (floor area)
Cost : 1 300 000 €
Date : Studies in progress 2025
The mission concerns the Elm Maintenance and Manufacturing workshop, as well as the future extension of the workshop to the ground floor. The project includes the renovation and interior rehabilitation of the ground floor of the main workshop, the workshop mezzanine (zone A), as well as a 200m² extension to the ground floor (zone B), as well as a 200m extension to the ground floor (zone B) for the machining area.
The project was designed according to the HQE charter, so as to be integrated into the ZNIEFF type 2 Natural Zone, also registered in a NATURA 2000 site. The design of the extension, low carbon and bioclimatic, makes it possible to reduce energy consumption.