bioclimatic energy refurbishment, INSTALLATION of PHOTOVOLTAIC
pannels in the potable water plant of LONGUEVILLE (77) - FRANCE
Client : The School of Saint-André
Location : Choisy-le-Roi (France, 94)
Project : Refurbishment of the refectory and extension
Consultant : AR ARCHITECTES, EPDC, MEBI, IETI, ALMA CONSULTING
Cost : 5 900 000 €
Date : Studies in progress 2025
The project of the Saint André school group is divided into several tasks: the demolition of an existing buildings in bad condition, the construction of a new food service for the current and future requirements of the Saint André school group and an additional teaching facilities for the middle and high schools students. The project also includes the creation of planted areas throughout the school. The School will be operationnal during all the construction period.