Marines (95)

Eco-Design of Wetlands in the Sewage Treatment Plant of Marines - France

Client : City of Marines

Location : Marines, France

Project : Construction of wetlands

Mission : Landscaping

Consultant : AR ARCHITECTES

Area : 1 600 m²

Cost : 7 800 000 € (plants + wetlands)

Date : End of construction March 2009

This plant is designed in accordance with the HEQ® standards: Zero visual pollution, Zero smell and noise pollution. During the design phase, all types of pollutions were kept at a low level using technical precautions that ensure comfort for on-site workers and surrounding residents. 1600 m² of constructed wetlands have been designed and executed to treat a flow 376m3 per day.